Who'll stop the rain? Who cares! Due to imminent foul weather our contractor will be looking for some inside work. Commence removal of ceilings on first floor. This is being done to both access the front girt and increase the headroom. Two front rooms are original plaster, rear keeping room and kitchen addition have beaver board set between the joists. If we are lucky we will be able to cathedral the kitchen. Current kitchen area:
Galley kitchen is actually to the right and opposite the fireplace, currently with only old dishwasher and sink. Will we move it all to the keeping room?
By the way, here are a couple of pix taken after we ripped up the addition carpeting and started to disassemble the bookcases: Hmmmmmmm, not posting, stay tuned...